TECHNICAL SPECS
OWNER
Edward J. Minskoff
LOCATION
On Avenue of the Americas
between 45th & 46th Streets
ARCHITECT
Skidmore, Owings & Merrill
LOBBY ARCHITECT
Gensler
TOTAL SQUARE FEET
Approximately 1.6 million sf
STORIES
44
SLAB TO SLAB HEIGHT
12' Typical
20' 3" 2nd floor
15' 6" 12th floor
CONSTRUCTION
Structural steel and concrete
LOBBY (NEWLY RENOVATED)
Stone and wood panel walls and
limestone floors
PASSENGER ELEVATORS
26 Total:
7 serving floors 3–12
8 serving floors 12–23
6 serving floors 2 and 24–35
5 serving floors 35–44
TRUCK FREIGHT ELEVATORS
2 cars serving street to basement –
60,000 lbs capacity
FREIGHT ELEVATORS
First Car: H 8’5” / W 7’5” / D 5’7” / Wt 4,000 lbs
Second Car: H 10’ / W 7’8” / D 5’0” / Wt 4,000 lbs
HEAT
Steam-heated hot water
HVAC
Central Plant: (2) 2,200-ton carrier centrifugal
compressor driven by 7-state Murray Turbine;
4 condenser water pumps – 2,200 GPM each:
VAV systems on all floors
ELECTRIC
Submetered; 6 watts per sf, 3,500 amp services
terminate at 5 - 460 volt main switchboards located in basement.
TELECOM PROVIDERS
Verizon, AT&T, Crown Castle, Level 3, Lightower,
Time Warner Cable
Distributed Antenna System (DAS) installed in building
WIRED CERTIFICATION
Platinum
EMERGENCY POWER
Detroit Diesel 1500, KW serves life safety & critical
building equipment
PLUMBING
2 separate service city water pumped to 9
house tanks
LIFE SAFETY
Class “E” System – installed in 2000
SPRINKLER
Building fully sprinklered
RESTROOMS
Brand new ADA-compliant restrooms with high density
fixture count for maximum floor capacity
EXECUTIVE PARKING
Up to 6 spaces available